Nantucket Capital Committee Backs Harbor Barge, Flags Sewer Risk Before Town Meeting

NANTUCKET — April 23, 2026 — Nantucket's Capital Program Committee reviewed three infrastructure items at its April 23 meeting, none requiring a formal vote but all headed toward Town Meeting action. Deputy Police Chief Gibson and Harbormaster Sheila Lucy presented a new 30-foot aluminum mooring barge quoted at $237,980, with the Great Harbor Yacht Club covering half the cost; Lucy said the existing 2005 Carolina skiff has "zero freeboard" and forces the town to hire private contractors to move its largest buoys. Gibson also updated the committee on the Harbormaster building reconstruction, projected at $4.9 million with a professional estimate due April 30 and demolition targeted for just after Labor Day; prior HDC approvals have lapsed and must be restarted. Public Works Director David Gray presented the most urgent item: a Fairgrounds Road sewer main installed in the 1950s that is already surcharging into manholes, with projected flows set to nearly double to 70,000 gallons per day once Tacoma Green and surrounding developments come fully online — almost triple the line's original permitted load of 287 bedrooms. A technical amendment to fund a replacement 12-inch line will be presented at Town Meeting.

Keep reading with a 14-day free trial

Subscribe to The Nantucket MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Nantucket MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Nantucket County News

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.